ENERGHEA

Independent power producer · Edo State, Nigeria

Firm solar power for Edo State.

ENERGHEA is developing a 19.35 MWp solar plant at Gbokuli, in Ovia North-East, on 70 acres of freehold land. Designed by Studio Santi and built in three blocks, it will supply industrial customers, the surrounding communities and the distribution network.

Site plan: three solar blocks on the 70-acre Gbokuli parcel, Block 1 highlighted Block 1 6,500 kWp Block 2 6,400 kWp Block 3 6,454 kWp grid connection N
Concept layout by Studio Santi. Site at 6.6677 N, 5.5914 E.
8.0 m pitch 18° south
Array elevation. Fixed-tilt rows at 18°, facing due south, 8.0 m between rows, so no row shades the one behind it through the working day.
Installed capacity
19.35MWp DC
Freehold site
70acres
Construction blocks
3× ≈6.5 MWp
Net annual generation
23,485MWh

Why it works

Businesses here pay diesel prices for power.

Industrial and commercial users in Edo State self-generate with petrol and diesel at four to six times the regulated grid tariff, and carry the fuel logistics, the maintenance and the downtime themselves.

What electricity costs in Edo State
Naira per kilowatt-hour, range by source of supply, 2025
Range bars: petrol generator 600 to 900 naira per kWh, diesel generator 450 to 750, regulated grid Band A 219 to 241 0 250 500 750 1,000 Petrol generator 600–900 Diesel generator 450–750 Grid, NERC Band A 219–241

Sources: NERC Band A tariff, 2025. Generator ranges are ENERGHEA estimates of self-generation costs in Edo State, fuel only.

View as table
Source of supplyNGN per kWhAvailability
Petrol generator, small commercial600–900On demand, at cost
Diesel generator, industrial450–750On demand, at cost
Grid, NERC Band A219–24120+ hours a day when supplied

ENERGHEA supplies the same energy from the sun, firm through daylight hours, at a price set below the regulated tariff.

No capital outlay. No payback period for the customer. A lower bill from the first invoice, and a supplier whose interest is in keeping that supply continuous.

A customer running a 500 kVA diesel generator ten hours a day spends its energy budget on fuel before it spends anything on maintenance, on the generator, or on the failures. On the same consumption, ENERGHEA cuts that bill by roughly three quarters.

The plant

Sited, engineered, specified.

The layout, array configuration and electrical architecture are the work of Studio Santi, the Italian engineering practice named Advisor of the Year at the 2025 AFSIA Solar Awards for its solar projects across Africa. Studio Santi stays with the project through detailed design, tender and construction supervision.

= ~ 1,500 V DC 0.8 kV AC 33 kV Direct industrial customers Community mini-grid Distribution company PV strings 28 modules in series String combiner Inverter DC to AC Transformer 0.8 / 33 kV · 2.5 MVA
From module to customer. Strings run at 1,500 V DC, are inverted to AC, stepped up to 33 kV, and the output is split across the three sales channels.
One module. 720 Wp, 132 cells, N-type TOPCon, bifacial.
Capacity
19,354 kWp DC ≈ 15.9 MW AC
Site
70 acres (28.3 ha), freehold Gbokuli, Ovia North-East LGA, Edo State · 6.6677 N, 5.5914 E
Array
Fixed tilt, ground-mounted 18° tilt, azimuth due south, 8.0 m row pitch
Modules
720 Wp N-type TOPCon, bifacial 132 cells; strings of 28 in series
Electrical
1,500 V DC architecture Cast-resin distribution transformers, 2.5 MVA, 0.8/33 kV
Yield
1,411 kWh per kWp per year PVGIS-SARAH2 for the site coordinates
Output
23,485 MWh net per year 25-year design life, 0.5% annual module degradation

Built in three blocks, not one campaign

Each block is electrically complete and sells power on its own. Commitment to the next block follows the demonstrated performance of the one before it, so capital is deployed against an operating record rather than a forecast.

  1. Block 1
    6,500 kWp

    Carries the one-off works: grid connection, monitoring platform and site establishment.

  2. Block 2
    6,400 kWp

    Committed on Block 1's operating record. Cheaper per watt, because the shared works already exist.

  3. Block 3
    6,454 kWp

    Completes the plant at 19,354 kWp.

Who we supply

One plant, three kinds of customer.

The same electricity reaches three markets with different needs. Direct industrial supply and the community mini-grid come first. The distribution network takes what they do not.

Commercial and industrial supply

Factories, institutions and businesses within reach of the site that run on diesel today. Firm daytime supply on a monthly invoice, and savings from the first month.

Community mini-grid

A prepaid, metered mini-grid for the communities around the plant, bringing affordable electricity to households and small businesses that have never had a reliable connection.

Distribution network

A long-term power purchase agreement with the local distribution company for the output the first two channels do not take, adding scale and a bankable contract.

Reliability

Firm means measured, monitored and maintained.

A price below diesel only matters if the power arrives. The plant is designed so that supply, metering and maintenance are measured and contracted from the first day of generation, not added later.

00:00 06:00 12:00 18:00 24:00 solar generation industrial load, 06:00 to 22:00 evening gap
A working day. Generation follows the sun and covers the daytime load; the evening hours, when factories run shifts and households need light, are the case for battery storage.

Community

A plant the community earns from.

A community that benefits from the plant protects it, speeds its consents and prevents land disputes. ENERGHEA treats that as a business principle, written into how the company is set up.

solar plant distribution line homes on prepaid meters school, clinic
The community channel. A distribution line from the plant to the villages around it, every connection on a prepaid meter, with community buildings on the same line.

Where the project stands

Concept design complete. Licensing next.

The grid connection and the environmental assessment are the longest items and sit on the critical path. Both start ahead of financial close.

Done

  • Site secured 70 acres of freehold land at Gbokuli
  • Concept design complete Layout, array configuration and electrical architecture by Studio Santi
  • Equipment specified Preliminary design basis and costed equipment schedule

In progress

  • Company incorporation ENERGHEA LIMITED, Corporate Affairs Commission, Edo State
  • Land title perfection Certificate of Occupancy, Edo State Government
  • First customer conversations Industrial and institutional users near the site

Next

  • Generation licence Nigerian Electricity Regulatory Commission
  • Grid connection agreement Benin Electricity Distribution Company
  • Environmental and social impact assessment Federal Ministry of Environment
  • Block 1 financing and construction

Contact

Talk to us about supply, partnership or investment.

If you run a site on diesel within reach of Gbokuli, if you represent a community near it, or if you finance infrastructure in Nigeria, we would like to hear from you.

Wrigth Ihase
Founder & Managing Director
+39 380 461 5944 wihase@energhea.com ENERGHEA LIMITED · Edo State, Nigeria